Mr. Kraus got the price down to $13,995 from an original estimate of up
to $20k. I believe it's a 7.5 ton unit. Price includes crane,
installation, and permits. 

Mechanical Scope:
Install one Roof top unit in the original location and supply one custom
made curb for the new roof top unit to
be installed upon. Install one economizer per code. Weatherproof all new
connections and mastic seal the duct
connections. We will adapt the new roof top unit to the existing
utilities and sleeve the line voltage wiring in new liquid
tight material. Mount a new weatherproof disconnect and supply mounting
brackets. Provide one electrical heater
package and install with a fusible disconnect. Install one matching
thermostat with a lock box option. 

Crane is included in the cost below as well with All permitting. 

* Plaster, Drywall, Carpentry and Painting are not included. They will
be extra if required.

---
Tim Hagan
Treasurer, Libertarian National Committee 

On 2019-11-19 12:15, Steven Nekhaila wrote:

> Have we gotten a second look by another company for competitive pricing? And if we are doing a full replacement, does that include freight, crane, install, and taxes? Also, are we getting the correct sized tonnage unit for the space? 
> 
> We just spent around $14,000 for a replacement 10 tonne unit for the kitchen HVAC for one of our stores. You may have to look into electrical if that is included or will we have to contract another company to do it? Please advise. 
> 
> Sincerely, 
> 
> Steven Nekhaila 
> 
> On Tue, Nov 19, 2019 at 2:36 PM -0500, "Tim Hagan via Lnc-business" <lnc-business at hq.lp.org> wrote:
> 
>> Sorry. Original plan was to replace one of two compressors to get a
>> couple of more years out of the HVAC system. However, the contractor
>> found the Freon leak was worse than anticipated and the other compressor
>> also had a leak. In the Director's of Operation report, he expected to
>> raise funds to replace the entire HVAC system and replace it by early
>> spring, before the weather got hot. This motion is to replace the HVAC
>> system now instead of waiting until spring since the blower went out
>> yesterday and the office has no heat. The Building Fund has sufficient
>> funds to go ahead and replace it now. 
>> 
>> ---
>> Tim Hagan
>> Treasurer, Libertarian National Committee 
>> 
>> On 2019-11-19 10:50, John Phillips wrote:
>> 
>>> Doesnt really answer the question, but like I said needs to be done regardless
>>> 